Dangerous Oklahoma Wind Farm – That was gonna be the piece that I ran

But the Oklahoma Newspaper put up a stinking pay wall that pissed me off. So here is the reference to that:

https://web.archive.org/web/20221108194553/https://www.oklahoman.com/story/business/energy-resource/2021/06/19/oklahoma-corporation-commission-concerned-panhandle-wind-farm-broken-turbines-poses-safety-threat/7523260002/

Here is a video peek:

 

So now I will have to post a more desultory post about how to properly maintain a wind farm and what that costs. But they had some cool pictures of things like a Turbine House destroyed at 300 feet. Turbine blades dangling and swinging in the wind. Everyone called it DANGERous. But here is the more mundane side of things. What the bad boys should have been doing.

https://www.windpowermonthly.com/article/1010136/breaking-down-cost-wind-turbine-maintenance

Breaking down the cost of wind turbine maintenance

Cutting costs by preventing failure instead of running wind turbines until they break lies at the heart of a new approach to operations and maintenance.

OR

http://www.renewableenergyfocus.com/view/21860/the-challenge-of-wind-turbine-blade-repair/

The challenge of wind turbine blade repair

07 November 2011
George Marsh

 

:}

Go there and yawn. More next week

:}

 

 